Articles

May 29, 2020

The Importance of 3D Documentation for Critical Tooling

In this modern era, 3D documentation is a vital part of many manufacturing processes, particularly where quality assurance and control of critical tooling are concerned. In this age of computer-aided design, it is shocking that many manufacturers still depend on engineering prints for their manufactured parts and rarely maintain drawings/documentation for critical tooling.
May 21, 2020
Pre-Start Health and Safety Review

Understanding Pre-Start Health and Safety Reviews: What Is It and When Is It Triggered?

A PSHR is an Ontario requirement to be completed prior to any new or modified apparatus, structure, or process undergoing operation.
May 14, 2020
Overhead Crane

3 Reasons Why a Full-Service Crane Company Is Better Than an Inspection Only Company

Everyone knows when you have an overhead crane, it must be inspected and certified on an annual basis and it requires maintenance. When choosing a vendor to provide this service, there are several considerations to take into account.
May 4, 2020
Multi-Tiered Crane Loads

The Challenges with Multi-Tiered Crane Loads

Rules are more stringent and require that special procedures be developed to ensure worker’s safety. Here’s a primer on the new regulations.
May 3, 2020
Lifting engineer using critical lift plan protecting load

When Do I Need a Critical Lift Plan?

When to employ a critical lift plan is one of the most frequent questions our lifting engineers are asked, and one that has no single definitive answer.