Articles

October 25, 2002

OH&S Fines and Violations

Domson Engineering & Inspection were contracted to provide lift engineering services at Petro-Canada’s Oakville refinery during a shutdown occurring this month. The first major lift, however, occurred on August 11, 2002 involving a new 110 foot fractionator tower weighing in at 325,000 lbs.
June 25, 2002

The Role of the Mobile Crane Inspector and the Engineer

Most inspection companies do not have engineering capabilities and therefore hire an engineer to sign off their crane inspections.